All good things must come to an end and pretty soon it was time to open the new hotel, convention center and casino. But not till we survived another disaster. The hotel tower had been built directly over the convention center and on the day of the grand opening, the plumbers opened the main water line to the hotel rooms. They had used a temporary line to test all of the plumbing in the tower, but now it was going to be the real deal; city water pressure.
I was in the convention center, admiring my work, now that all of the lights were on. The walls were freshly painted and the carpet layers were finishing up a few seams on the vast expanse of carpet. Suddenly there was a roar and water began to pour down through the ceiling, about twenty feet above us. I used my radio to call for help. The plumbers responded, but not until a large portion of the ceiling was destroyed. It turned out that one fitting on a 1-1/2” copper line had never been soldered. And that fitting was on the 16th floor, with an open shaft all of the way down to the convention center.
Crews were soon vacuuming up the water while I took a 20’ length of cold rolled channel and began poking holes in the ceiling wherever it was sagging. Plenty of ceiling tile was already on the floor but we had remove all of the wet, or even damp ceiling before we could begin reconstruction. And the grand opening was scheduled for 8 that evening. It was now 10 in the morning. Yikes!
Of course we did it…money is no object when it’s time to open a casino.
No comments:
Post a Comment